|
Viewing 1 to 2 (2 Total) Signaling/Operation |
|
|---|---|
|
Total Posts: 38
|
Hey all, So I am beginning to do some testing into automatic signaling/operations in L-Gauge, and wanted to make sure im not re-inventing the wheel. On youtube; http://www.youtube.com/user/mirekEnd uses Signals, but they appear to be human controlled. on Eurobricks; http://www.eurobricks.com/forum/index.php?s=92814fa42f4e24da7bf09da9af3687f5&showtopic=45358 uses a great system to make operational rail lines, but requires human-controlled locomotives. I am hoping to develop a way for a working layout to be run autonomously, while still being able to add in human interaction. Thanks! -Colin |
|
Total Posts: 38
|
re: Signaling/OperationAnd when you read this Jeremy, could you please delete the other six? Thank you. |
Your post has been saved and will be published after approval by the forum moderator.

